History of wall conservation project:
the top cover
Corrugated sheet metal
Cloth over metal
Cloth over frame
The moisture basin
Mud roof
Plain metal
For further details cf. the section about the conservation of the Palace walls in the dedicated digital book.
Corrugated sheet metal
UNDER CONSTRUCTION
|
Back to top
Cloth over metal
UNDER CONSTRUCTION
|
Back to top
Cloth over frame
UNDER CONSTRUCTION
|
Back to top
The moisture basin
UNDER CONSTRUCTION
|
Back to top
The mud roof
UNDER CONSTRUCTION
|
Back to top
Plain metall
UNDER CONSTRUCTION
|
Back to top